How Much Does a Contractor Cost?

There is no single sticker price for a general contractor, because a contractor does not sell a product — they sell the coordination and risk of building your project. What you pay is the cost of labor and materials plus the contractor’s markup for running the job. This guide explains how that markup works, the ranges you can expect in 2026, and how to tell a fair number from a padded one.

The short version

  • A general contractor’s fee is usually a markup on the total job, not a flat rate.
  • Markups covering overhead and profit commonly land in the 10 to 20 percent range, and can run higher on small or complex jobs.
  • On a cost-plus job the fee is stated openly; on a fixed-price job it is baked into one number.
  • Size, complexity, access, materials, and your local market all move the price.
  • The lowest bid is not automatically the cheapest once the job is finished.

How contractors actually charge

Most residential general contractors price a job in one of two ways. The first is a fixed price: the contractor estimates every cost, adds a markup, and quotes a single number to complete the scope. The second is cost-plus: you pay the actual cost of labor and materials, plus an agreed fee that is either a percentage or a flat amount. A third, hourly billing, shows up mostly on small or open-ended work.

In every model, the contractor’s markup has to cover more than profit. It pays for estimating, scheduling, supervision, insurance, permits, warranty callbacks, and the simple risk of guaranteeing a price on work that has not happened yet. When people say a contractor is “expensive,” they are often forgetting everything that markup is quietly paying for.

Typical markup ranges

As a rough guide, overhead-and-profit markups on residential work commonly fall in the ranges below. Treat these as typical starting points, not quotes — a small, fussy job can carry a higher percentage because the fixed costs are spread over fewer dollars.

Job typeTypical markup rangeWhy
Large, straightforward projectLower end, around 10 to 15 percentFixed costs spread across a big budget
Mid-size remodelRoughly 15 to 20 percentTypical supervision and coordination load
Small or highly custom job20 percent or moreSame overhead over a smaller total
High-risk or rush workHigherExtra risk, overtime, or tight scheduling
Advertisement

What drives the price up

Two identical-sounding projects can carry very different prices. The usual reasons:

Pro tip — ask how the fee is calculated, not just the total

Whether a bid is fixed-price or cost-plus, ask the contractor to explain how their fee is structured and what it covers. A pro who can walk you through overhead, profit, and contingency without getting defensive is usually pricing honestly. Someone who bristles at the question is worth a second look.

Is the lowest bid really the cheapest?

Not always. A bid that comes in well below the others usually means a smaller allowance, cheaper materials, an excluded task, or an underestimate that will resurface as change orders once work begins. The goal is not the lowest starting number — it is the lowest realistic total to finish the job well. Compare what each bid includes before you compare the bottom lines.

Ready to get real numbers?
Compare local general contractors and get bids on Contractors At Your Service.
Find a Contractor →

FAQ

What percentage does a general contractor take?

It varies, but overhead-and-profit markups on residential work commonly land somewhere in the 10 to 20 percent range, running higher on small or complex jobs. On cost-plus contracts the percentage is stated openly; on fixed-price contracts it is built into the single number you are quoted.

Should I pay hourly or a fixed price?

Fixed price gives you cost certainty and shifts the risk of overruns to the contractor, which suits well-defined projects. Hourly or cost-plus can make sense for small or open-ended work where the full scope is not yet clear. Each has trade-offs; the right choice depends on how defined the job is.

Why are two bids for the same job so different?

Usually because they are not actually the same job. Different material allowances, exclusions, timelines, or assumptions about hidden conditions can move a bid by thousands. Put the finalists on identical written scope and the numbers get much easier to compare.

Can I negotiate a contractor’s price?

You can, but negotiate the scope, not just the number. Trimming an allowance, phasing the work, or choosing different materials lowers the price honestly. Squeezing a contractor to work below cost tends to backfire in corners cut or a job left unfinished.

General information for homeowners — not legal or professional advice. Remodeling costs, permits, and licensing rules vary by location and change over time; confirm with a licensed local contractor.

×